Wind Farm Installation Project Job

Wind Farm Jacket Installation Project

I’m looking for multiple candidates in each of the following roles. Candidates should have relevant experience on similar projects. This involves installation of 1000 tonne jackets. British nationals only due to visa processing times since the end of the Brexit Transition Period. Start dates in April/May and you will be hired direct by the client on PAYE basis.

Able Seaman
Able Seafarer Deck
Able Seafarer Engine
Electrician
Mechanic
Motorman
Pedestal Crane Operator (Stage 3)
Riggers and Foremen(OPITO Stage 3, minimum 600t lift experience)
Welders and Foremen (SMAW, FCAW and GTAW experience required)

All CVs to lewis.millen@ablyresources.com for more information

Related Articles

Back to top button
error: Content is protected !!